Please complete and submit application with supporting attachments in the form below. The application submission must be received by 5pm PST on the Thursday prior to the scheduled VNHOA Board meeting. All approvals will be in writing. One set of plans as a final approval will be retained in your file as a permanent record.
MANDATORY FILING REQUIREMENTS FOR ARCHITECTURAL COMMITTEE REVIEW:
Please make certain you have included all items listed for your submittal. The Architectural Committee cannot review your submittal without the requested information for your particular proposed work. Omissions may not be noticed until the review meeting, which will cause review to be put off for a month until the missing information can be obtained from you.
1. The front of your home
2. Your next door neighbors (on both sides)
3. Paint chips of the proposed paint colors
Valencia Northbridge HOA Digital Color BookDownload
Approved paint colors are for the purpose of maintaining a color standard. Homeowners MUST FILL OUT AN ONLINE APPLICATION for approval. The Architectural Committee must not only review approved paint color, but also the colors of houses to the left and right sides of the subject property.
ROOM ADDITIONS / PATIO COVERS / FREE STANDING STRUCTURES:
Submit a SITE PLAN to scale, showing dimensions of existing house, patio, etc. and the proposed improvements you wish to make. Show lot lines, size and distance of improvements to the lot lines, proposed materials, and North arrow.
Submit FLOOR PLANS to scale of all levels including appropriate dimensions.
Submit a DRAWING OF THE FRONT OF YOUR HOUSE to scale of all affected elevations including building heights and dimensions. Specify existing materials. Specify proposed colors. Proposed materials should match existing materials wherever possible.
Submit a COLOR PHOTOGRAPH of the existing portions of your house that the improvement will affect.
LANDSCAPE / HARDSCAPE / POOL / SPA ADDITIONS:
Submit a SITE PLAN to scale showing dimensions of existing and proposed improvements. Show lot lines and North arrow.
Submit a SITE PLAN to scale showing proposed improvements including any additional lighting. Include heights of any proposed walls and specify proposed materials to be used. Describe the existing materials that are adjacent to the proposed improvements. Proposed materials should match existing materials wherever possible.
Submit PAVING/HARDSCAPE CALCULATIONS for any proposed paving/hardscape work to be done in the front yard. Front yard paving may not exceed 30% per the Valencia Northbridge Homeowners Association Architectural Guidelines.
Submit a PLAN to scale showing the proposed pool equipment enclosure. Show the enclosures proximity to your closest neighbor. Show any proposed sound dampening measures taken.
Wrought Iron Paint Color
If your wrought iron is in need of new paint, you can repaint using the following color: Dunn Edwards – Northbridge Tan
Pre-Approved Locking Mailboxes
Neighbor Awareness Form
- Neighbor Awareness Form (required with applications involving construction)
View Rights
Solar Panels